Killtest offers free demo for 1Z0-233 Exam. You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only onesite can offer demo for almost all products.
1. The patch 384610 was applied to the Test environment successfully. To schedule the patch to be
applied to the Production environment, the Applications DBA should inform the users of the unavailability
of the Production environment. Which report can the Applications DBA look at to determine the estimated
duration of the task, assuming the hardware, server load and applications running on the servers are
unchanged?
A. Timing report
B. Bug Fixes report
C. Files Copied report
D. Action Details report
E. Patch Details report
F. Action Summary report
Answer: A
2. A worker process has been running for a long time, and appears to be hanging. Which are the four
correct actions that an Oracle Applications 11i database administrator (DBA) would take to resolve this
issue? (Choose four.)
A. Start and use the AD Controller utility.
B. Get that worker process ID.
C. Restart the failed job by using AD Controller.
D. Check for an entry for this process in the V$SESSION table.
E. Check the worker log file in $AD_TOP/admin/<SID>/log.
Answer: ABCD
Tags:
Post comment:
◎welcome to give out your point。